Www.dot.ca.gov
11 At locations where integral felt and primer have been scraped from the top of the existing board insulation, The strainer screen shall have a open area equal to at least 3 times the cross-sectional area of pipe in which 19 The Contractor shall install pipes and fittings from the ... Access Content
Blog.syracuse.com
INSTALL LED LIGHTING AND HISTORIC ENVIRONMENT ELEMENTS. TO PURCHASE A NEW HVAC UNIT FOR THE AMERICAN LEGION POST. FOR LIBRARY LOFT PROJECT. new siding on front and repair to the board and batten. Mr. Keith McNally Frankfort Hill Historic Society 2338 Albany Road Frankfort, ... Fetch Doc
Bookshelf - 'Women For Hire: The Ultimate Guide To Getting A ...
We cross-reference with each other; we have pocket PCs; Internet access; board-and-batten and lap siding. For more information, visit www.stearnsmarnella.com or call Liz Holland or Suzie Tridente at 503-654-1769. JLS Custom Homes finishes model home. ... Fetch This Document
MRP08 SOR As Amended
Supply & install new aluminium double hung window to existing opening up to 1.5m2) Attend property within 24 hours and board up windows and/or doors with approved materials. supply and fix new batten holder and mounting flange. Complete unit, heat resistant. All sizes. ELE00800 ... Return Document
Wondows, doors, minor elec rewiring, new flooring and sheetrock. 2489 bristol rd ken 050-120-036 bld12-0031 sfd reroof t/o 29sqrs 15# flet 50yr comp self board and secure water tower house (sfd on south end of parcel). sfd install siding over existing t1-11 16150 laughlin rd gue 069 ... Fetch Doc
TRI-CITIES BUILDINGS AND SITES
The original pine siding pine clapboard later was resided A modern loft-kitchen later was added to the ballroom, and a four-foot attic had a hatch Without a record of the original features of the house, the Januszes installed woodwork, windows, and flooring salvaged from old houses in ... View Document
Job Statistical Report
Loft Board City Owned Little e PC Filed Plumbing Mechanical Boiler Fuel Burning Fuel Storage INSTALL DOORS TO EACH AUDITORIUM FOR NOISE CONTROL. (PARTITIONS,FINISHES, FLOORING, NEW PLUMBING FIXTURES) DOOLEY STREET SB BORIS LEVIN 28 ... Read Full Source
Job Statistical Report - New York City
150-65 CROSS ISLAND PKWY 402628689 122-12 APPLICATION FILED TO INSTALL NEW CABINETRY, FLOORING, COUNTERTOPS AND PATCH AND REPAIR WALLS. NO CAHNGE TO USE, Proposed filing to repair and replace existin gypsum board, flooring and subfloor fue to water damage. ... Fetch Document
Www.shtfinfo.com
When the string hangs over this mark the lower board will be level. between the short legs of the washstand, was left open for the crumb and draining trays. A piece of batten was nailed around the top as a finishing touch. A The way to secure this is to install a water supply system, ... Doc Retrieval
Rpt002 - ANC 6A
Purchase material to be determined by HPO. Demo all front siding install wood REPAIR AND REPLACE EXISTING BALLOON FRAMING AS PER PLAN INSTALL CLAP BOARD INSTALL PARTITION ON THE FIRST FLOOR AND BASEMENT UPGRADE ELECTRICAL INSTALLATION TUB IN MASTER BEDROOM INSTALL FLOORING ... Visit Document
MRP08 Schedule Of Rates - Effective From The 1st July 2011
Board up material must be capable of preventing access and/or protecting windows and doors. (Supply & install loft mount brackets) Supply & install loft mount brackets. (Remove & dispose of existing & supply & fix batten holder. White or colour to match) ... Access This Document
... Return Document
Cross-cut const/mat dudek install vinyl siding on back of house not visable from street no structural changes 1500 sq.ft. exterior wood board and batten siding. plywood sheathing framing as required. no structural work. #201010052275 ... View Document
Crafts - YouTube
Install plywood and cement board, install a new granite tile counter top how are you going to install your hardwood laminate floor? It would be very difficult, if not impossible, on how to install hardwood laminate flooring without these special Board & Batten 4'x6' Quaker Chicken ... View Video
Sandy.utah.gov
Abet flooring supplies debra a jaramillo c sale flooring supplies 0.00 801-352-1922 arcs ski & board roy ostendorf c ski & snowboard shop 6.00 801-572-9719 45 w 10600 s 84070.00 batten & shaw inc -a-james batten c admin office for contra 3.00 801-352-2044 ... Retrieve Content
Job Statistical Report - Welcome To NYC.gov | City Of New York
Install new 10-0 curb cut with (2) 150-65 cross island pkwy install new storepront. ceiling, flooring & partition works as per plan. no change in use, egress or occupancy. 302312058 1080 52 street zissy kish 1080 ... Doc Viewer
Cross-cut const/mat dudek install vinyl siding on back of house not visable from street no structural changes 1500 sq.ft. exterior wood board and batten siding. plywood sheathing framing as required. no structural work. #201010052275 ... Return Doc
99SSP_Template
12 7.06 ROOF BOARD 128. 12 7.07 SPRAYED ON FIREPROOFING 129. • When cross sections are included with the contract plans, • The Contractor shall install and maintain in operating condition an electronically actuated moisture meter that will indicate, ... Access This Document
No comments:
Post a Comment