MRP08 Schedule Of Rates - Effective From The 1st July 2011
(Remove & dispose of existing & supply & fix over flashing to fascia at starter tile with 0 Supply and install a 250 wide x 150mm deep concrete band around Plastic or Lift floor coverings (including vinyl, linoleum and carpets), underlays and fixings (such as battens, tacks, nails ... Fetch Here
Cms.walsall.gov.uk
Circular plastic ventilator or the like Flexible flooring, Altro Marine 20 safety waterproof, non-slip Stripping off roof coverings, felt and battens including ridges, verges, hips, hip irons etc. and remove from site. ... Read Document
Projects.buildingsmartalliance.org
2. 4. 61826. 46350. 61826. 38804. 49544 49544. 72113. 2893. 60061. 49120. 14733. 49512. 53547. 46140. 90670. 11729. 28787. 61827. 92336. 2451. 60061. 11763. 28105. 53052. 30269. 15108. 65708. 60523. 92878 ... Read Here
Www.zen9607.zen.co.uk
Flooring:renew asphalt ne 1sm in patch asphalt flooring 114103 flooring: roof tile:refix plain renew felt, battens 201313 roof tile:overhaul plain tile roof complete 201501 verge:rake out and repoint in mortar renew clear plastic 213007 sheeting:renew coloured plastic 213009 sheeting ... Retrieve Doc
TRADES - Homebuilding
Plastic piping and fix standpipe. Above-ground AND TILE ROOF 5-10 DAYS Decide who is to be responsible for leadwork. battens for plasterboard to ceilings, loft trap, cylinder stands and staircase. Carry out any external rendering as required. ... Fetch Here
Scrapfolding - YouTube
Roof tiling - fixing battens. by Simon Brown 9,623 views Decra lightweight roof tile installation - Ridges installation and ridge ends and hip intersections. by DecraRoofSystems 14,315 views We spaced the cross supports approx 31.5" ... View Video
Techincal Standards - Volume 3 - North East Lincolnshire
K20 Timber board flooring/ sarking Provide where unsupported laps in underlay occur between battens. H60/35 TILE at eaves between all rafters to ensure free air space not less than required by Building Regulations for ventilation of roof space. P10/10 LOFT INSULATION: - Insulating ... Retrieve Full Source
TRADES - Homebuilding
Plastic piping and fix standpipe. Above-ground Felt, batten and tile roof. Bed ridge, point verges and valleys. noggings, battens for plasterboard to ceilings, loft trap, cylinder stands and staircase. Confirm position of cylinder and ... View Full Source
Www.amgriffiths.co.uk
Or alternatively plastic pipe work Terminals to contain integral condensation drain to allow any condensate to clear away to the roof. Slate / tile terminals to provide Ceilings to the underside of concrete floors shall be fixed to timber battens or proprietary galvanised steel or ... Access Doc
Www.dot.ca.gov
REMOVING PORTIONS OF EXISTING ROOF COVERING. 2 PART 1 - GENERAL. 3 SUMMARY. coated, or plastic pipe or conduits, sand shall be used for backfill. The strainer screen shall have a open area equal to at least 3 times the cross-sectional area of pipe in which used (based on NPS) ... Read Here
** WARNING ** WARNING ** WARNING ** WARNING **
9.03 VINYL COMPOSITION TILE 125. 9.04 PAINTING 126. DIVISION 10. SPECIALTIES 131. 10.01 LOUVERS 131. snow roof and overhead doors to be county, and contract number, with ample cross-references to the contract documents, to facilitate identification of items and their location in ... Retrieve Document
Gateshead Council Logo - Warm Zones C I C
The Tenderer should allow for a minimum 5% of roofs requiring tile vents. INSULATED ROOF TRAP which is to be securely fixed to the roof hatch. Wherever a loft ladder is fitted A seal consisting of a low-density plastic/cellular foam core encased in a low friction carrier mounted ... Retrieve Content
MRP08 SOR As Amended
All types, plastic and stainless steel. PLU09300 (Repair leak in waste, fitting or trap) Repair leak in waste pipe, (Tile roof - complete remove and dispose of existing and supply and fix roof material as specified to 2 bedroom cottage including new concrete roof tiles, roof. battens ... View Document
NOTE: PLEASE DO NOT SCALE FROM THIS DRG. NOTE: CONTRACTOR TO ...
Cross battens. Insulate between with glass reinforced plastic finish to match colour of slate roof. INSULATION: Where ceiling follows pitch line; insulate between rafters with 50mm thick Kingspan Kooltherm K7 Pitched Roof Boards Flooring to be grade tongue and groove chipboard cover. ... Return Document
Www.npt.gov.uk
Concrete/clayplain tile, all cutting and labour items, flooring grade , tongued and grooved joists, fixed to joists Form loft access hatch 600 x 450, to include all trimming, framing, architrave and 12.5mm plywood cover ... View Full Source
Part 7 Roofs Chapter 7 - NHBC
Sizes and spacing of tile battens 19 APPENDIX 7.2-E Strutting for attic trusses and cut roofs opposite sides of the roof to permit cross ventilation. Reference should be made to Sitework clause 7.2 draughtstripping loft hatches and sealing holes for services, are given in Sitework ... Access Document
11PAN Masterspec - Home | Stanley Group | Strong Partnerships ...
Include cross references to other sections where these contain related work. Refer to the appropriate tile roofing section for tile battens etc. 1.2DOCUMENTS. Design and fit roof trusses complete with anchorage. All fabricated and fastened to . NZS 3604, section 9, Posts. and 10, ... View This Document
Can The - Green Frontier
0 0.0 Wood 2.9 6,512 1.4 5.3 -5.3 Plaster/render 6.9 5,951 1.3 0.0 0.0 Other materials 18.7 5,853 1.3 0.0 0.0 U-PVC/Plastic 0.5 10,737 1.1 0.0 0.0 Total Main verander roof battens. Nearby. Door. Recycled. Verander and lean-to cross-bracing. Porch roof (decorative to hide fibreboard ... Access Doc
Install standing seam meteal roof, install additional framing for new clear plastic reinforced wall panels, and installation of new replace failed flooring, health issue. Replace roof and door on fire sprinkler pump Replace flooring and restroom/locker room tile in the main building ... View Full Source
No comments:
Post a Comment