AMERICAN GOTHIC PLAYHOUSE
30 1x2 8’ Battens, 8 2x2 8’ Spacers at roof, cut a 4’-9” crosspiece. On the porch end of the flooring frame, position and nail (using 10d nails) the cross-piece 30” from the outside of the frame end. 5. Cut two 2x6 flooring joists. ... Retrieve Content
AMERICAN GOTHIC PLAYHOUSE
8 2x2 8’ Spacers at roof, trim at windows Above Ground 36 2x4 Cut four 2x6 flooring joists to a length of 4’-9” each cut a 4’-9” crosspiece. On the porch end of the flooring frame, position and nail (using 10d nails) the cross-piece 30” from the outside of the frame end ... Get Doc
Gateshead Council Logo - Warm Zones C I C
Installation of Loft and Cavity Insulation Measures for which is to be securely fixed to the roof hatch. Wherever a loft ladder is fitted directly A seal consisting of a low-density plastic/cellular foam core encased in a low friction carrier mounted in a rigid PVC-U box section ... Retrieve Here
Part 7 Roofs Chapter 7 - NHBC
With glass reinforced plastic (GRP), lead or other material acceptable under Technical opposite sides of the roof to permit cross ventilation. Reference should be made to Sitework clause 7.2 – S11(a) down by the valley battens, where used. The main roof underlay should be cut to ... View This Document
PLEASE NOTE: THIS IS AN EXAMPLE DRAWING OUR SPECIFICATIONS ...
For flooring grade insulation type & fillets to top of roof steel and secure to roof joists. All to be supplied and fitted as per cross ventilation. Roof joist anchoring: Ensure ends of the roof joists are tied down to wall Lead flashing: ... View Full Source
Www.npt.gov.uk
Provision of new stainless steel wall ties where only patching(including cleaning cavities) B11 plastic window boards and mastic seal plus making good to reveals and existing finishes K51 K52 K53 flooring grade , tongued and grooved joists, ... Read More
MRP08 SOR As Amended
All types, plastic and stainless steel. PLU09300 (Repair leak in waste, fitting or trap) Repair leak in waste pipe, fitting or trap. and dispose of existing and supply and fix roof material as specified to 2 bedroom cottage including new concrete roof tiles, roof. battens & foil sarking. ... Retrieve Full Source
Techincal Standards - Volume 3 - North East Lincolnshire
Stainless steel fitted with plastic insulation retaining clips as recommended by manufacturers . Stainless steel. - Size: - Cross section: Not less than 30 x 2.5 mm. - Length: Fix to raise tiling battens and lift roof tiles clear of trough tiles. - Valley trough tiles: ... Content Retrieval
PLEASE NOTE: THIS IS AN EXAMPLE DRAWING OUR SPECIFICATIONS ...
50x25mm TREATED SW BATTENS 4 8 1 2 18mm T&G FLOORING GRADE TIMBER 150 MIN TYPICAL SUSPENDED FLOOR DETAIL SCALE 1:10 Foundations: 600mm x 300mm DP with A393 mesh T&B 40mm Nom (See notes) fillets to top of roof steel and secure to roof joists. ... View This Document
TRADES - Homebuilding
Plastic piping and fix standpipe. Above-ground noggings, battens for plasterboard to ceilings, loft trap, cylinder stands and staircase. Confirm position of cylinder and Carpenter: Flooring grade insul - ation, vapour barrier, moisture- ... Read Full Source
TRADES - Homebuilding
ROOF TILING AND LEADWORK GLAZING PLUMBING ELECTRICS PLASTERING AND ARTEXING plastic piping and fix standpipe. Above-ground battens for plasterboard to ceilings, loft trap, cylinder stands and staircase. Carry out any external ... Fetch This Document
Can The - Green Frontier
Lean-to roof battens. Main verander roof battens. Nearby. Door. Recycled. Verander and lean-to cross-bracing. Porch roof (decorative to hide fibreboard) Studwork 1st flr All Steel. Plaster and Render. All Sand. All Plastic. All Concrete. Mineral/Rock wool. Plaster/render. U-PVC/Plastic. ... Document Retrieval
MRP08 Schedule Of Rates - Effective From The 1st July 2011
(Supply & install loft mount brackets) Supply & install loft (galvanised steel ducting) penetrate roof covering, flash with material compatible to the existing roof cladding and supply and fix plastic and stainless steel. PLU09300 (Repair leak in waste, fitting or trap) Repair leak in ... Return Doc
** WARNING ** WARNING ** WARNING ** WARNING **
5.01 STRUCTURAL STEEL FOR BUILDINGS 95. 5.02 METAL ROOF DECKING 98. 5.03 METAL PANEL FASCIA 100. 5.04 BUILDING MISCELLANEOUS METAL 102. DIVISION 6. and contract number, with ample cross-references to the contract documents, to facilitate identification of items and their location in the work. ... Doc Viewer
Www.dot.ca.gov
Coated, or plastic pipe or conduits, sand shall be used for backfill. The strainer screen shall have a open area equal to at least 3 times the cross-sectional area of pipe in which used (based on NPS) Steel hinges shall be bolted to underside and pivot on tension bars for easy ... Fetch Doc
Scrapfolding - YouTube
Roof tiling - fixing battens. by Simon Brown 9,623 views an American Red Cross spokeswoman said Wednesday, This video shows you how to install a COLORBOND® steel roof including the safety issues, the tools required and some traps to avoid. ... View Video
SUSTAINABLE CONSTRUCTION GROUP - Home | Department Of Finance ...
Plastic materials throughout the site are to be segregated Slingsby ladder loft ladder Re-use External strip of roof covering rainwater goods, etc, (domestic type construction (unlikely to be recovered intact) Softwood battens To landfill (could be used on site as ... Access Document
No comments:
Post a Comment