Www.pillar.saqnet.co.uk
Tiles shall be from Decra Roof Systems Ltd, Unit 7, Church Road Industrial Wooden battens and counter battens for tiling All small scantlings which cannot be pre-treated and any cross cut ends or notchings of the treated timber shall be liberally swabbed with a suitable solution ... Visit Document
TENDER - Dena Bank
The Grid features Main Runner & cross Tee Roll Formed from Galvanized 550.00 Mts. Rs. 5 Installing of I/O face plate for ,design,color & shade on existing flooring with the help of “BAL” or “ROOF” make flooring adhesive as per the Architects instructions in line ... Get Content Here
Wondows, doors, minor elec rewiring, new flooring and sheetrock. 2489 bristol rd ken 050-120-036 bld12-0031 sfd replace roof top furnace, 72k btu's, replace a/c unit plumbing and elec. 10/08/12 add to scope of work: installing gas line 4577 creekmont ct rin 029-050-068 bld12-2713 sfd ... Visit Document
School room renovations to include casework, plumbing, windows, flooring, furniture, painting, equipment, etc. Installing power for each heat tape located on the High Schools roof. This building is used as a Red Cross Shelter for the Burlington-Edison School District community. ... Get Doc
MRP08 Schedule Of Rates - Effective From The 1st July 2011
Cleaned off and to be sealed with one (1) coat of pigmented sealer, Wooden cover moulds and features are to be treated and primed as specified downpipes, gables etc. (excluding roof). For painting timber window add item PTG01500 (Supply & install loft mount brackets ... View Document
Techincal Standards - Volume 3 - North East Lincolnshire
K20 Timber board flooring/ sarking Fix to raise tiling battens and lift roof tiles clear of trough tiles at eaves between all rafters to ensure free air space not less than required by Building Regulations for ventilation of roof space. P10/10 LOFT INSULATION: - Insulating ... Return Doc
... Read Document
If timber windows are used they are to be treated with preservative in accordance with BS5589 and NHBC recommendations and provide a 30 year guarantee against rot or fungal decay. Loft Hatches. All roof voids must be accessible using insulated trap When installing cables on new build ... Access Content
Gateshead Council Logo - Warm Zones C I C
It is the sole responsibility of the Tenderer to assess the suitability for installing cavity fill. which is to be securely fixed to the roof hatch. Wherever a loft ladder is fitted beams to be securely screw fixed. The Tenderer will supply and fit 19mm flooring grade chipboard ... Read Here
PASSIVE WOODEN HOUSE - TMT 2013
The roof structure of the house with a loft consists of: tile, bars, roof cardboard plates 12.5 mm. The ceiling structure of the house with a loft consists of: flooring, sound insulation, ironing 2.2 cm , bearing timber structures cross battens , 42 mm Paroc insulation ... Fetch Document
MRP08 SOR As Amended
Supply and fit treated pine timber support stake 50mm x 75mm including saddles. Dispose of old materials and dispose of existing and supply and fix roof material as specified to 2 bedroom cottage including new concrete roof tiles, roof. battens & foil sarking. ... Access This Document
ELECTRICAL MATERIAL SPECIFICATION
Near Income Tax Cross Road The supports shall be MS fabricated duly treated and painted for Make wooden frame work at 600 to 750 mm centers on ceiling slab by fixing 50 x 50 wooden battens using 75mm long wooden screws and self ... View Doc
Loft Hatches. All roof voids must be accessible using insulated trap hatches. Slip resistant sheet flooring e.g. vinyl or Linoleum flooring Residents’ preference: When installing cables on new build schemes, ... Read Content
11PAN Masterspec - Home | Stanley Group | Strong Partnerships ...
Include cross references to other sections where these infestation may return if the timber is not treated with timber treatment (or replaced Avoid prolong exposure by installing the roof immediately. Installation to comply with . NZBC E2 /AS1 8.1.5.1, Underlay support. and NZMRM Code ... Get Document
Www.dot.ca.gov
Furnishing and installing any intermediate equipment required by the serving utilities, REMOVING PORTIONS OF EXISTING ROOF COVERING. 2 PART 1 - GENERAL. 3 SUMMARY. Deleterious matter that will decrease the effectiveness of the treatment shall be removed from all areas to be treated. ... Document Viewer
Www.pillar.saqnet.co.uk
Tiles shall be from Decra Roof Systems Ltd, Unit 7, Church Road Industrial Wooden battens and counter battens for tiling All small scantlings which cannot be pre-treated and any cross cut ends or notchings of the treated timber shall be liberally swabbed with a suitable solution ... Fetch Content
Aicpwdea.com
Loft Insulation 200mm Loft Roll Insulation cross head screwdriver, wire cutters, spanners, 3 core flexible cable (1.mm2 or 1.5mm2)</li><li>Fixings included</li><li>Easy-to-follow fitting instructions</li></ul></p></ul> ... Fetch Doc
** WARNING ** WARNING ** WARNING ** WARNING **
2.02 REMOVING PORTIONS OF EXISTING ROOF COVERING 75. 2.03 EARTHWORK FOR BUILDING and the furnishing and installing of all materials, articles, and contract number, with ample cross-references to the contract documents, to facilitate identification of items and their location in the ... Read More
Physical Flood Vulnerability Of - Ilan Kelman
(Chapters 7-12). Frequent exchange and cross-referencing occurs between the two blocks in Part II Flat columns can be effectively treated as a house for the (11%) walls had sections covered by tile, timber siding (also termed facing, cladding, battens, batts, boards ... View Doc
No comments:
Post a Comment