Friday, August 2, 2013

Loft Flooring Cross Treated Metal Roof Battens

Techincal Standards - Volume 3 - North East Lincolnshire
K20 Timber board flooring/ sarking Fix to raise tiling battens and lift roof tiles clear of trough tiles at eaves between all rafters to ensure free air space not less than required by Building Regulations for ventilation of roof space. P10/10 LOFT INSULATION: - Insulating ... Doc Retrieval

MRP08 SOR As Amended
Supply and fit treated pine timber support stake 50mm x 75mm including saddles. and dispose of existing and supply and fix roof material as specified to 2 bedroom cottage including new concrete roof tiles, roof. battens & foil sarking. (Metal Roof - Complete remove ... Return Document

Www.pillar.saqnet.co.uk
Tiles shall be from Decra Roof Systems Ltd, Unit 7, Church Road Industrial Wooden battens and counter battens for tiling All small scantlings which cannot be pre-treated and any cross cut ends or notchings of the treated timber shall be liberally swabbed with a suitable solution ... Fetch Here

Www.dot.ca.gov
For Standardization LEED Leadership in Energy and Environmental Design NAAMM National Association of Architectural Metal Manufacturers NEC National 34 Treated areas shall be The strainer screen shall have a open area equal to at least 3 times the cross ... Return Document

Can The - Green Frontier
Paint. 9.28 Cladding on timber-framed construction. Pre-treated softwood weatherboarding, breather membrane: OSB/3 sheathing, timber Main verander roof battens. Nearby. Door. Recycled. Previously a Verander and lean-to cross-bracing. Porch roof (decorative to hide fibreboard ... Get Document

11PAN Masterspec - Home | Stanley Group | Strong Partnerships ...
Include cross references to other sections where these contain related work. infestation may return if the timber is not treated with timber treatment (or replaced with treated timber) NZMRMNZ Metal Roof and Wall Cladding - Code of Practice. Note: AS 1530.2 is cited in . ... Read Here

MRP08 Schedule Of Rates - Effective From The 1st July 2011
Cleaned off and to be sealed with one (1) coat of pigmented sealer, Wooden cover moulds and features are to be treated and primed as specified, prior downpipes, gables etc. (excluding roof). For painting timber window add item PTG01500. PTG00300 (Paint (Fix metal or PVC ... Document Viewer

Part 7 Roofs Chapter 7 - NHBC
Opposite sides of the roof to permit cross ventilation. Reference should be made to Sitework clause 7.2 – S11(a) draughtstripping loft hatches and sealing holes for services, are given in Sitework Battens should be preservative treated ... Doc Retrieval

Www.forestoakestimates.co.uk
Tiles or slates on battens and underfelt; Beam and block flooring system; Excavate oversite 150 mm deep; off site disposal; weedkiller treated; loft hatch opening with aluminium ladder including hatch and architraves 9/1/15 ... Document Viewer

** WARNING ** WARNING ** WARNING ** WARNING **
5.02 METAL ROOF DECKING 98. 5.03 METAL PANEL FASCIA 100. 5.04 BUILDING MISCELLANEOUS METAL 102. DIVISION 6. county, and contract number, with ample cross-references to the contract documents, to facilitate identification of items and their location in the work. ... Retrieve Content

Www.amgriffiths.co.uk
Composite timber or steel support beams / columns as necessary to support the timber frame and / or roof Ceilings to the underside of concrete floors shall be fixed to timber battens or proprietary galvanised steel or 100 x 100mm softweed treated posts with 75 x 75mm cross rails fixed ... Fetch Document

Www.pillar.saqnet.co.uk
Tiles shall be from Decra Roof Systems Ltd, Unit 7, Church Road Industrial Wooden battens and counter battens for tiling All small scantlings which cannot be pre-treated and any cross cut ends or notchings of the treated timber shall be liberally swabbed with a suitable solution ... Doc Viewer

ELECTRICAL MATERIAL SPECIFICATION
Near Income Tax Cross Road All metal parts should be inherently resistant to corrosion and treated to make them Make wooden frame work at 600 to 750 mm centers on ceiling slab by fixing 50 x 50 wooden battens using 75mm long wooden screws and ... Access Full Source

SUSTAINABLE CONSTRUCTION GROUP - Home | Department Of Finance ...
Slingsby ladder loft ladder Re-use External strip of roof covering rainwater goods, etc, (domestic type (unlikely to be recovered intact) Softwood battens To landfill (could be used on Where indicated existing contaminated earth or backfill to be retained and treated ... Document Viewer

AMERICAN GOTHIC PLAYHOUSE
8 2x2 8’ Spacers at roof, trim at windows Above Ground 36 2x4 12’ Rafters, Fastener & Connector Performance for Treated Wood Metal products in contact with pressure-treated wood must be corrosion Using 3/4” treated plywood, cut two flooring pieces, 4’x5’ and 2’-8”x5’. ... Get Document


The district intends to replace the roof with a standing seam metal roof system. replace failed flooring, health issue. Replace roof and door on fire sprinkler pump ouse, This building is used as a Red Cross Shelter for the Burlington-Edison School District community. ... Access Full Source

No comments:

Post a Comment