Gateshead Council Logo - Warm Zones C I C
Installation of Loft and Cavity Insulation Measures for which is to be securely fixed to the roof hatch. Wherever a loft ladder is fitted directly A seal consisting of a low-density plastic/cellular foam core encased in a low friction carrier mounted in a rigid PVC-U box section ... Retrieve Content
PLEASE NOTE: THIS IS AN EXAMPLE DRAWING OUR SPECIFICATIONS ...
For flooring grade insulation type & cross ventilation. Roof joist anchoring: Ensure ends of the roof joists are tied down to wall 50x25mm TREATED SW BATTENS 4 8 1 2 VAPOUR PERMEABLE UNDERLAY RAFTERS AT 600mm c/c MAX PROPRIETARY RAFTER VENTILATOR ... View This Document
Can The - Green Frontier
Paint. 9.28 Cladding on timber-framed construction. Pre-treated softwood weatherboarding, breather membrane: OSB/3 sheathing, timber Main verander roof battens. Nearby. Door. Recycled. Previously a Verander and lean-to cross-bracing. Porch roof (decorative to hide fibreboard ... Fetch Document
Www.pillar.saqnet.co.uk
Tiles shall be from Decra Roof Systems Ltd, Unit 7, Church Road Industrial Wooden battens and counter battens for tiling All small scantlings which cannot be pre-treated and any cross cut ends or notchings of the treated timber shall be liberally swabbed with a suitable solution ... View Document
Cms.walsall.gov.uk
Circular plastic ventilator or the like Flexible flooring, Altro Marine 20 safety waterproof, non-slip ROOF COVERINGS INCLUDING FELT AND BATTENS, RIDGES, VERGES HIPS, IRONS, ETC. Composite Pitched Roofing LEAD FLASHINGS ... Retrieve Doc
School room renovations to include casework, plumbing, windows, flooring, furniture, painting, equipment, etc. replace failed flooring, health issue. Replace roof and door on fire sprinkler pump ouse, This building is used as a Red Cross Shelter for the Burlington-Edison School District ... Visit Document
Www.amgriffiths.co.uk
Or alternatively plastic pipe work with matching fittings to Composite timber or steel support beams / columns as necessary to support the timber frame and / or roof structure . 100 x 100mm softweed treated posts with 75 x 75mm cross rails fixed to top of posts with 50mm galvanized ... Get Document
** WARNING ** WARNING ** WARNING ** WARNING **
General work description: Storage building to be constructed; Emulsion tank, fence, snow roof and overhead doors to be installed. county, and contract number, with ample cross-references to the contract documents, to facilitate identification of items and their location in the work. ... Retrieve Document
Www.dot.ca.gov
For wrapped, coated, or plastic pipe or conduits, sand shall be 34 Treated areas shall be protected in accordance with the instructions shown on the EPA approved product The strainer screen shall have a open area equal to at least 3 times the cross-sectional area of pipe in ... Access This Document
PLEASE NOTE: THIS IS AN EXAMPLE DRAWING OUR SPECIFICATIONS ...
50x25mm treated sw battens 4 8 1 2 18 plastic soffit u.n.o. 19 proprietary eaves ventilator 20 plastic fascia (t o match existing) 13 18mm t&g flooring grade timber 150 min typical suspended floor detail scale 1:10 foundations: 600mm x 300mm ... Access Content
Techincal Standards - Volume 3 - North East Lincolnshire
K20 Timber board flooring/ sarking Fix to raise tiling battens and lift roof tiles clear of trough tiles at eaves between all rafters to ensure free air space not less than required by Building Regulations for ventilation of roof space. P10/10 LOFT INSULATION: - Insulating ... Retrieve Document
AMERICAN GOTHIC PLAYHOUSE
Cut four 2x6 flooring joists to a length of 4’-9” each. Enclose wall framing using treated 1x8 boards and 1x2 battens. NOTE : Interior can be finished with 3/8” treated plywood. Cover roof framing with 1/2” treated plywood; ... Fetch Full Source
MRP08 Schedule Of Rates - Effective From The 1st July 2011
Cleaned off and to be sealed with one (1) coat of pigmented sealer, Wooden cover moulds and features are to be treated and primed as downpipes, gables etc. (excluding roof). For painting timber Supply and install a 250 wide x 150mm deep concrete band around Plastic or ... View This Document
AMERICAN GOTHIC PLAYHOUSE
Cut four 2x6 flooring joists to a length of 4’-9” each. 15.Enclose wall framing using treated 1x8 boards and 1x2 battens. NOTE: 20.Cover roof framing with 1/2” treated plywood; use 6d nails and construction adhesive. ... View Document
SUSTAINABLE CONSTRUCTION GROUP - Home | Department Of Finance ...
Plastic materials throughout the site are to be segregated Slingsby ladder loft ladder Re-use External strip of roof covering rainwater goods, etc, (domestic type construction (unlikely to be recovered intact) Softwood battens To landfill (could be used on site as ... Doc Viewer
Part 7 Roofs Chapter 7 - NHBC
Opposite sides of the roof to permit cross ventilation. Reference should be made to Sitework clause 7.2 – S11(a) draughtstripping loft hatches and sealing holes for services, are given in Sitework Battens should be preservative treated ... Retrieve Content
MRP08 SOR As Amended
Supply and fit treated pine timber support stake 50mm x All types, plastic and stainless steel. PLU09300 (Repair leak in waste, fitting and dispose of existing and supply and fix roof material as specified to 2 bedroom cottage including new concrete roof tiles, roof. battens & foil ... Return Document
No comments:
Post a Comment